Wednesday, July 8, 2009

"IN-DUST-TRIAL" TRAINING


Greetings all. So, what have been done since the last 10 weeks? To me, nothing much a hush but there's this internship attachment eager to be told.


Generally, I can conclude that much knowledge has been gained during the practical training. As I was allocated at the Bridge Division of one of Sarawak largest consulting firm, i.e. KTA(Sarawak) Sdn.Bhd, the honor & gratitude is always mine.


To be part of the winning team, ability to learn from the best in their fields & the opportunity, support & guidance given throughout the training, I thank you.


In a nutshell, let these photos captured during the training period foretell the rest of the story, as the saying goes "pictures are worth than thousand words". Enjoy!




Main KTA (Sarawak) Sdn.Bhd. building
Me with Associate Director Ir. Michael Hii
(abv-R) With Design Engineers at office.
(abv-L) One and only THE SPRING
(my fav. spot to hang out)






Some under construction bridges
I've visited in Padawan District.






Machinery used during construction of bridge.
Boring machine, SPT (N) Value determination,
Static Load Test & Bar bending equipment.





Mobilization of crane, excavator,
Bulldozer, lorries etc.
Picture showing pre-cast concrete girder.






With the site supervisor & Resident Engineer (RE)
(abv) Anticipated to become future Civil Engineer (CE)



p/s - That's part & parcel of my "in-dust-trial" training & it turns out to be a memorable one.

No comments:

Post a Comment

Related Posts with Thumbnails